Walk-in Shower Conversion

    Convert your bathtub to a beautiful, accessible walk-in shower.

    Get Your Free Estimate

    Step 1 of 5Project

    What kind of project?

    Pick the option that fits best — you can add details next.

    1,200+

    Projects Completed

    15+

    Years Experience

    ROC #349454

    Licensed & Insured

    100%

    Satisfaction Guaranteed

    Walk-in Shower Conversion in Arizona

    Tub-to-shower conversions are the single most-requested bathroom project in the Valley, driven by the aging-in-place demographics of Sun City, PebbleCreek, Leisure World, and Trilogy communities — and by younger homeowners who simply never use the tub. ProWorx Restoration removes the existing alcove tub, re-frames the curb (or eliminates it for a zero-threshold pan), rebuilds the waterproofing assembly, and installs new tile, fixtures, and a custom glass enclosure. See our parent bathroom remodeling service for whole-room rebuilds.
    Conversions in Arizona homes have a few quirks worth planning around. Slab-on-grade construction means the original tub drain is offset 12–14" from the wall while shower drains sit centered — that requires saw-cutting the slab and re-plumbing in PVC. Hard water (10–18 gpg) etches frameless glass, so we specify low-iron glass with factory ClearShield or EnduroShield nano-coatings. Monsoon humidity spikes also drive ventilation requirements: we upsize exhaust fans to 80–110 CFM per ASHRAE 62.2 to keep the new shower mold-free.
    Every conversion is permitted when required and built to IRC P2708 (shower-floor area minimum 1,024 sq in, with 30" clear in every direction), ANSI A118.10 waterproofing standards, and ADA 4.21 grab-bar specs when accessibility is a goal. ProWorx is licensed under Arizona ROC #349454, fully insured, and backs every conversion with a written warranty. Serving Scottsdale, Sun City, and the entire Phoenix metro.

    Our Tub-to-Shower Conversion Process

    Day 1: dust containment, tub removal, drain saw-cut and relocation. Days 2–3: framing changes, blocking for grab bars, PEX supply re-route, and rough inspection. Days 4–5: waterproofing membrane installation and flood test. Days 6–8: tile install and grout. Days 9–10: fixture trim, glass measure. Day 14–18: glass install after fabrication. Final walk and warranty handoff. Total calendar time is typically 2.5–3.5 weeks from start to finished shower.

    Common Issues We Find in Valley Conversions

    Behind the tub apron we frequently encounter rotted sill plates from decades of slow leaks, undersized 1.5" drains that must be upsized to 2" for shower use, missing exhaust ventilation in 1970s–80s Valley builds, and copper supply lines pinholed by hard water. We address each in scope so the new shower starts with sound substrate and modern materials — not a cosmetic cover-up. For broader water-damage issues, see bathroom water damage repair.

    Materials & Accessibility Standards

    We build to ADA 4.21 when accessibility is the goal: 60" minimum shower width for roll-in use, 33–36" reinforced grab-bar blocking, lever-handle valves, and slip-resistant DCOF 0.42+ floor tile. Glass is ⅜" or ½" tempered with PVD-coated hardware. Tile is set with Laticrete 254 Platinum and finished with Mapei Ultracolor Plus FA grout. Waterproofing follows TCNA B415 (curbless) or B421 (curbed) details with full flood testing before tile.

    Why Choose ProWorx?

    Alcove tub removal and shower pan rebuild

    Zero-threshold (curbless) and low-curb options

    Schluter Kerdi or hot-mop waterproofing systems

    Frameless low-iron glass with ClearShield coating

    ADA-compliant grab bars, benches, and handheld wands

    Custom porcelain, ceramic, or natural-stone tile

    PEX re-pipe and PVC drain relocation as needed

    Permit and inspection coordination, ROC #349454

    Our Proven Process

    01

    Free Consultation

    We visit your property, discuss your goals, and provide a detailed, no-obligation estimate.

    02

    Custom Plan

    Our team creates a tailored project plan with timeline, materials, and transparent pricing.

    03

    Expert Execution

    Licensed craftsmen complete your project with quality materials and meticulous attention to detail.

    04

    Final Walkthrough

    We inspect every detail with you and ensure complete satisfaction before the job is done.

    Ready for Your Free Estimate?

    Licensed contractor ROC #349454 · Serving Mesa & the Phoenix Metro area

    Frequently Asked Questions

    Ready to Get Started?

    Contact ProWorx Restoration today for a free consultation and estimate.